Saturday, 2 October 2010

Group Schedule

We have come up with a group schedule for the planning stage:


  • Grace:
- possible and finalised cast list: 5th November 2010
- possible locations: 5th November 2010
- risk assessment sheet: 5th November 2010
- shooting schedule: 10th November 2010
  • Sophie:
- prop list: 3rd November 2010
- call sheet: 10th November 2010
- in charge of contacting Warwickshire police about filming with toy gun: 16th November 2010
  • Ellie:
- possible cast list: 1st November 2010
- storyboard: 5th November 2010
- script written up: 5th November 2010
- shot list: 10th November 2010
- font test: 12th November 2010
- mock up of film poster: 26th November 2010
  • Tim:
- costume design: 5th November 2010
- finalised music for trailer (cut and edited): 15th November 2010
- putting trailer structure together on final cut pro: 15th November 2010
- storyboard images (basic structure)
- final cut pro: 16th November 2010
- storyboard structure and music
- Direct and Film Trailer.
  • Group:
- film and magazine titles: 21st October 2010
- possible cast: 1st November 2010
- costume ideas: 1st November 2010
- script brainstorming: 1st November 2010

No comments:

Post a Comment